ISO 17025 accredited calibration laboratory +49 7245 80475-0 info@inotech.eu
Home/Products/Commercial gas meter test system

Commercial gas meter test system for low pressure

Test and calibration systems for diaphragm and rotary piston meters in commercial and light industrial use – as nozzle system or with reference meters, using the same operating concept as the domestic and large gas systems.

Test hall with commercial gas meter test systems
MEASURING RANGE
0.1 – 100 m³/h
METER SIZES
G10 – G65
MEASUREMENT UNCERTAINTY
≤ 0.25 %
TEST POSITIONS
1 – 10

What the system delivers

Commercial meters sit between domestic and industrial applications: flow rates above 10 m³/h. The system covers this range with critical-flow nozzles or in combination with reference meters – depending on customer requirements and measurement uncertainty.

Up to G25, clamping is the same as on domestic gas meter systems; test sequence and reporting are identical for all sizes, so operators can switch between systems without retraining. For used meters, an optional meter purge for removing residual gas is available.

Typical operators are meter manufacturers with a mixed portfolio, municipal utilities and verification bodies.

Scope of supply
Reference meter or nozzle bank with pressure and temperature measurement
Pneumatic clamping system
Blower or compressor unit with frequency control
Control cabinet, operator station and test software
Test rack, with hose connections for meters > G25 where required
Test hall with large gas meter test rigs
Commercial gas meter test rig with large gas meter extension
Shut-off valve of an inotech test system
Test bench with 3 test positions
Nozzle bank with reference nozzles
Block & bleed valves with nozzle block

For large flow rates and long test cycles

Two reference principles

The best of both worlds. Combinable to suit customer requirements.

Flexible test position layout

Depending on the meter sizes to be tested, the number of different test positions can be combined.

Fast meter change

Pneumatic meter clamping, as in the domestic range. Heavy meters stay on the floor and are connected there, or are moved into the test position with lifting gear.

Controlled flow rates

Frequency-controlled blowers for stable test points across the entire measuring range.

Automatic test sequences

Test point sequences, error curves and adjustment values from the test software.

Traceability

References can be recalibrated in the inotech calibration laboratory, DAkkS D-K-23505-01.

Technical specification

VALUES DEPEND ON CONFIGURATION · BINDING IN THE PROJECT DATA SHEET
Measuring range
0.1 – 100 m³/h
Meter sizes
G10 – G65
Measurement uncertainty
≤ 0.25 %
Test positions
1 to 10
Nominal sizes
DN 25 to DN 80
Reference system
Critical-flow nozzles or reference meters
Test medium
Air, atmospheric operation
Meter types
Diaphragm and rotary piston meters, static meters
Automation
Fully automatic test sequence, optional robot feeding
Software
inotech standard user interface, identical across all system types
Interfaces
ERP/MES integration, network, database and CSV export
Documentation
Test reports, calibration certificates, ISO 17025-capable traceability

Configuration and expansion

Encoder testing

Plausibility check of encoder registers.

Additional test positions

Extension with additional test positions.

Meter handling

Extension with revolver clamping systems.

Retrofit

Replacement of controls, reference technology and software on existing systems.

Do you have specific technical requirements?

Send us your specification – meter types, flow ranges, number of test positions and the required degree of automation.

Measuring range of the commercial gas meter test system from 100 l/h to 100 m³/h

The inotech commercial gas meter test system closes the gap between domestic and industrial meters in the low-pressure range. It is designed for volume flows between 100 l/h and 100 m³/h, as they occur with meters in bakeries, workshops, hotels or smaller production plants. Because gas meter testing technology was the company’s starting point when it was founded in 1992, our engineers’ experience in this field goes back a particularly long way.

Our domestic gas meter test system handles domestic meters with a maximum of 10 m³/h and, with its series test benches, is designed for large batches. Industrial and large gas meters run on separate, larger systems. Each of these system classes is tailored to its range, from flow generation to clamping. This means you do not invest in performance reserves that your test volume never calls on.

Testing is carried out with ambient air as standard. If a different gas is to flow through the test line, we design the commercial gas meter test system accordingly.

The right reference principle for target uncertainty and cycle time

Two standards are available: critical flow nozzles or a reference meter. A nozzle bank sets a fixed volume flow for each test point that is available practically without waiting time. When many identical meters run through one after another, this noticeably shortens every single test run. The configuration of the nozzle bank determines the test points.

A reference meter, such as a rotary piston or turbine gas meter, on the other hand measures continuously. The flow is set by blowers or vacuum pumps, so test points can be chosen freely within the measuring range. If a test regulation changes or a meter type with different load points is added, you adapt the test program instead of expanding the hardware. Which principle your commercial gas meter test system receives is decided together according to the target measurement uncertainty and the specified cycle time.

Whether nozzle or reference meter: both can be calibrated. The same applies to the sensors that measure pressure and temperature on the test line. Our calibration laboratory for gas meters is accredited for gas flows that cover the entire measuring range of a commercial gas meter test system. On request, we also calibrate directly at your site.

A manufacturer’s mixed meter portfolio on one commercial gas meter test system

Many meter manufacturers offer diaphragm and rotary piston gas meters side by side in the commercial segment. Instead of setting up two separate lines, they test both designs on a shared commercial gas meter test system. A dedicated test program with test points and error limits is stored for each meter type, so a type change remains a matter of parameterisation.

In production, the commercial gas meter test system often runs over several shifts, and its mechanics are designed for this continuous operation. Depending on the cycle time, clamping is manual or automatic, in both cases with suitable inlet and outlet sections. A PLC controls the test sequence. On a Windows PC, our inotech Meter Calibration Software visualises the test data and manages the parameters. When this PC is replaced after a few years, there are no adaptation costs for the control system. Whether a single commercial gas meter test bench for the development department or several stations for series production: the number of stations depends on quantities and type variety.

Medium quantities and wide type variety in the daily testing of municipal utilities

Verification bodies of municipal utilities do not receive their meters as a uniform series, but as a mix of makes, sizes and years of manufacture. What determines cost-effectiveness here? The decisive factor is the time that passes between the last meter of one type and the first of the next. Our design therefore adapts the clamping devices and test line to the makes actually installed in your network. If a new make is added later, we add the matching test program.

A commercial gas meter test system from inotech is built in accordance with OIML and the European Measuring Instruments Directive 2014/32/EU and meets the requirements of the Physikalisch-Technische Bundesanstalt (PTB). Your test results are thus based on a foundation approved for legal metrology. Verification as a sovereign act remains the responsibility of verification authorities and state-approved verification bodies.

Since many verification bodies work with small teams, our support analyses a fault via remote access to the commercial gas meter test system before an on-site visit is even planned. Maintenance can be called off individually or agreed by contract at fixed intervals.

If water or heat meters are added to your verification body, staff work with the same software on every further meter test system from inotech. Nobody has to learn a second operating environment, which noticeably simplifies training and shift planning.

New commercial gas meter test system or modernisation of the existing system

Where an older system is already in your hall, even one from another manufacturer, we first check whether modernisation is sufficient or whether a new commercial gas meter test system is more economical. The decisive factors are the condition of the mechanics, the spare parts situation and your future testing needs. In a modernisation, we bring the control system, PC and software up to date and renew the mechanical structure if required. This increases the performance of the existing system and extends its service life.

The design of a new commercial gas meter test system is first sent to you as a drawing, and manufacturing only begins after your approval. At this point, corrections cost hardly more than a revised plan. Your contact from order clarification to commissioning remains one project manager whom we name before the start. Assembly and final testing take place in Bietigheim (Baden). We guarantee the supply of spare parts for ten years.

To assess an existing system, send us the manufacturer, year of manufacture and test task; for a new system, the meter types and your expected test volume. Our sales team compares modernisation and a new commercial gas meter test system and prepares a free quotation for you. You can reach them on +49 7245 80475-0 or by email at info@inotech.eu.